Continued Operation of Datteln Power Plant Units 1-3 in 2013

It looks like E.ON may continue operating its coal-fired power plant units 1 to 3 in Datteln even if the present operation permit expires at the end of 2012.  Continue reading ‘Continued Operation of Datteln Power Plant Units 1-3 in 2013’

OVG Münster: Commercial Use of Rooftops for PV Systems May Need Separate Construction Permit

The Higher Administrative Court of North Rhine-Westphalia in Münster (OVG Münster) decided that an additional construction permit may be necessary for the commercial use of rooftops for solar installations.  Continue reading ‘OVG Münster: Commercial Use of Rooftops for PV Systems May Need Separate Construction Permit’

OVG Münster Dismisses Action Against High Voltage Line Connecting Datteln Power Plant

The 11th Senate of the Higher Administrative Court of Münster (OVG Münster) dismissed the action brought by BUND against a high voltage line intended to connect E.ON’s building project for a coal-fired power plant in Datteln to the grid.

Continue reading ‘OVG Münster Dismisses Action Against High Voltage Line Connecting Datteln Power Plant’

North Rhine-Westphalia Backs E.ON on Datteln Coal-Fired Power Plant

In the dispute about the construction of a new coal-fired power plant in Datteln (North Rhine-Westphalia) by E.ON AG, the company has been backed by the state of North Rhine-Westphalia.   Continue reading ‘North Rhine-Westphalia Backs E.ON on Datteln Coal-Fired Power Plant’

E.ON Datteln Power Station Construction Stopped

A decision of the Higher Administrative Court (Oberverwaltungsgericht) in Münster has stopped construction work on the site. Continue reading ‘E.ON Datteln Power Station Construction Stopped’